Sure. I’m still sorting production of an initial quantity (30-50). Coronavirus has impacted fabrication facilities in China, pushing lead times to 50-75 days. which had in turn impacted local fabrication facilities and pushed out their lead times or pushed up the cost.
fortunately I have a friend with the right gear (pick and place, oven) who has made himself available to help move this along.
There are other things to sort though, parts, panelization, etc… all non-trivial. This is potentially large financial undertaking, so i’m taking my time.
yes, my grid is from 2007, walnut, and was DC powered until I upgraded it.
when it’s time, there will be a shopify (or similar) page to order from and express interest when restocking is needed.
it is my intention to get 50 or so out to people who can help verify firmware for different grid versions (think walnut, greyscale, 40h) and sizes (64,128,256,512). I will then get another 100-150 done soon after, based on interest i’ve seen expressed through this thread.